Milford, Connecticut · Serving Fairfield and New Haven County CT HIC #0661733 · Licensed and insured · (203) 496-6386
ATLASEpoxy Floors
★★★★★4.7 from 15 Google reviews
Lifetimeproduct warranty, so the risk is not yours
Same dayfree quotes, weekends included
CT HIC#0661733, licensed and insured
Commercial

Commercial Epoxy Floors, Phased Around Your Opening Hours

On your floor the coating is rarely the expensive part. The closed room is. We sequence the work around when you actually trade, so you get a floor that takes a mop and a chemical spill on the same day without losing the days you needed to be open.

Get Your Free Quote Call or Text (203) 496-6386

Free, no obligation, and nothing to sign. We answer the same day, weekends included.

Commercial Floor Coating Downtime

That depends more on the system we use than on the size of your floor, which is the opposite of what most people expect.

Cure time is the constraint

Grinding is a day's work. Waiting for coats to cure is what takes your calendar. A fast-cure top coat turns an overnight wait into a few hours, and across three coats that changes your whole schedule.

Working in sections

We can often phase your floor so part of the space stays open. It costs more in mobilisation and it is usually worth it against the trade you would have lost.

Nights and weekends

Worth asking us about. We work Monday to Friday 8am to 5:30pm and Saturday 8am to 3pm, and we take weekend appointments on request rather than as a standing offer.

Commercial Epoxy Flooring Requirements

Your cleaning regime, your inspections, and traffic that never stops.

Wash-down and hygiene

Your kitchen gets cleaned daily with hot water and chemicals. That points us at quartz, and usually at cove base up the wall so there is no joint at the floor edge.

Line marking

We put your walkways, bays and hazard markings down as part of the floor rather than taping them on afterwards.

Traffic that does not stop

Your retail floor is walked on every trading hour. The top coat is what wears, so it is the part we specify hardest.

Every floor on this page is one we poured

Commercial Floor Coating by Sector

What we specify changes more between a restaurant and a showroom than it does between two houses.

Restaurants and food premises

We use quartz with cove base up the wall, so there is no joint where your floor meets it. Grease and water together are the hardest combination a floor deals with, and hygiene inspection is usually what drives the specification.

Retail and showrooms

Appearance carries most of the weight here. We specify metallic and high-build gloss systems, with a top coat chosen for foot traffic rather than for wheels.

Warehouses and storage

Solid colour with line marking. Your floor is a working surface and we lay the markings into it rather than taping them on afterwards.

Auto shops and workshops

Chemical and oil resistance, plus the ability to take a dropped tool. This is where the aggregate-built system we use earns its cost.

Gyms and studios

Impact and cleaning. A dropped weight is a point load, and we specify your floor expecting it.

How a floor goes down

Three stages. You get your walk-on and park-on dates at the quote, not on the day.

  1. Tell us what you have gotCall, text, or send the form. Tell us the room and roughly how big it is and we will talk you through the range, then book a time to come and look. Same day, weekends included, and nothing to sign.
  2. We look at your concrete, you pick your finishBrad checks your slab for cracks, old coating and moisture, measures up, and you choose your flake blend or metallic against your own floor instead of a brochure. Your written quote follows that visit.
  3. We grind it back, then build your floor upYour slab goes back to bare concrete with a diamond grinder running dust extraction. Then the primer, the body coat carrying your flake or metallic, and the top coat. Brad tells you your walk-on and park-on times when he quotes, so you can plan around it.

Working Around a Business That Cannot Close

Your floor is rarely the hard part on a commercial job. Your calendar is.

Phasing the work

We can usually work in sections so part of your space keeps trading. It costs more in mobilisation and it is frequently cheaper than the days you would lose.

Fast-cure systems

A polyaspartic top coat lets us recoat in hours rather than overnight. Across three coats that is the difference between your weekend and your week.

Out of hours

Nights and weekends are a conversation with us rather than a standing offer. Ask early, because it changes how we plan the job rather than just when we start it.

What has to be moved

Racking, fixtures and stock all need to move. Anything you leave in place leaves an outline, and working around it costs you more than moving it.

Compliance, Marking and Cleaning Regimes

What your floor has to satisfy that a domestic one does not.

Slip resistance where it is wet

Kitchens, wash-down areas and entrances. We specify traction into your surface rather than adding it as a mat.

Cove base and coving

In food areas we turn your floor up the wall, so there is no 90 degree joint to collect anything. It is normally part of the same job.

Line marking and hazard areas

Your walkways, bays and keep-clear zones go down as part of the floor and wear at the same rate as it.

Cleaning that will actually happen

A floor built for daily hot wash-down is a different floor from one that gets swept. Be honest with us about your real cleaning regime at the quote. It matters more than a specification sounding impressive.

What customers wrote

4.7 from 15 Google reviews. We publish every one of them on the reviews page, including the one star and what came of it.

Floors came out great and the countertops too!
Segundo Puchaicela January 2026
thank you Brad for the wonderful job on my garage floors
Anita Dugatto January 2026
my floors look amazing
Benjamin Forman January 2026
Read all 15

What a Commercial Flooring Quote Should Contain

Comparing quotes on a single number is how businesses end up buying a floor twice.

Preparation method, named

Grinding, shot blasting or neither. If a quote does not tell you, that is the line most likely to have been cut.

System build by layer

Primer, body, broadcast, grout, top coat. A quote that names a product family and nothing else is not telling you what you are buying.

Moisture plan

What happens if your slab tests wet, and who carries that cost. Better agreed with you in writing before than argued after.

Return to service dates

Your foot traffic, wheeled traffic and full load are three different dates, and all three should be in the quote you sign.

Phasing and hours

What we are doing when, and whether the price assumes normal hours.

Epoxy or polyaspartic

How the two differ on what buyers ask about. Most Atlas floors use both. We are not selling you one of them.

What you are decidingEpoxyPolyaspartic
Cure time before you can walk on itA day or more, and longer when it is coldHours, which is what makes a fast turnaround possible
Working temperatureWants a warm slab, so winter work gets scheduled around itGoes down in cold weather when epoxy will not
Colour under direct sunAmbers over time in a doorway or a south-facing bayUV stable, which is why it goes on patios and pool decks
Build and depth of finishThicker build, and the depth metallic pours needThinner film, applied as the top coat over an epoxy body
Cost per square footThe lower of the two, and where most garages landHigher, and worth it where speed or sunlight decide it
How Atlas usually uses itBody coat and the flake or metallic layerTop coat for abrasion, chemical and UV resistance

Budgeting a Commercial Floor Against Downtime

The arithmetic most businesses skip, and the one that usually decides what we specify.

Cost the closed days

Your revenue per trading day multiplied by the days you lose. On a busy restaurant that number is frequently larger than the gap between two flooring quotes.

Then compare systems on time, not price

A faster system that costs you more per square foot can be the cheaper project once you count the lost trade.

Phasing has a price too

Extra mobilisations, more edges and more setup. Ask us to quantify it rather than assuming it is free.

And a floor done twice costs everything again

Including your downtime, which is the argument for preparation.

Retail and Showroom Floors

Where appearance carries the weight and your floor is part of the fit-out rather than part of the building.

Fitting the brand rather than the catalogue

Colour, gloss level and pattern are design decisions here, and we will sample them in the lighting your space actually uses.

Foot traffic wears differently from wheels

Grit walked in from outside is the abrasive. Entrance matting does more for your floor's life than any coating specification we could sell you.

Working around a fit-out programme

We usually go in before your fixtures and after first fix. Getting that sequence right with your main contractor saves protecting a finished floor through the rest of the works.

Phased around your opening hours

The coating is rarely the expensive part of a commercial floor. The closed room is. Work gets sequenced so the room comes back when you need it.

Get my free quote

Questions people ask

Do you work out of hours?

Ask us. It depends on your job and the calendar.

Can you do a floor in phases?

Often yes, so part of your space stays open. It costs more and it is frequently worth it.

Do you do line marking?

Yes, we lay them as part of your floor.

Is commercial priced differently?

Our rate bands are the same for you. Larger floors land in the lower bands because they are bigger.

How long will my business be closed?

It depends on the system far more than on the size of your floor. A fast-cure top coat can turn an overnight wait into hours, and we can often phase the work so part of your space stays open.

Do you do commercial kitchen floors?

Yes. We normally use quartz with cove base, built for your wash-down rather than for sweeping.

Can you work nights or weekends?

Ask. It depends on the job and the calendar, and it is better raised early because it changes how the work is planned.

Is commercial priced differently from residential?

The rate bands are the same. Larger floors land in the lower bands simply because they are bigger.

Can you coat over an existing commercial floor?

If yours is sound, often. If the existing coating is lifting, we take it off first, because recoating over a failed bond repeats the failure.

What should a commercial flooring quote include?

Your preparation method, the system build layer by layer, a moisture plan, three return-to-service dates, and whether the price assumes normal hours.

How do I compare commercial flooring quotes?

Not on the total. On what each one includes: preparation, system thickness, top coat, and what happens if your slab tests wet.

Do you do retail and showroom floors?

Yes. Colour and gloss are design decisions there, and we will sample them in the lighting your space actually uses.

Ready to stop looking at that floor?

Tell us roughly what you have and we'll come and look at it. The quote is free, there's nothing to sign, and you'll know what your floor costs before you commit to anything.

Get Your Free Quote Call or Text (203) 496-6386
Call or text(203) 496-6386 Free quote